Copyright © 2023 Techfluid Yantai Limited.
• Application: After Jackup Rig finishes well drilling, pile shoes should be pulled out for moving the pile leg, mud around pile shoe should be flushed off by using high-pressure seawater so as to facilitate pile pulling. Jetting hose is high-pressure flexible connection between main deck of platform and seawater pipe line among pile legs. • Hose structure: Tube: nitrile rubber based liner, oil resistance, seawater resistance, high temperature resistance and ageing resistance. Reinforcement: high tension steel cable. Cover: Neoprene rubber based cover, fire-proof, wear resistance, oil resistance, ozone& ageing resistance, UV resistance, which is applicable to marine environment. • Temperature range:-30℃ to +100℃. |
• Application:
After Jackup Rig finishes well drilling, pile shoes should be pulled out for moving the pile leg, mud around pile shoe should be flushed off by using high-pressure seawater so as to facilitate pile pulling. Jetting hose is high-pressure flexible connection between main deck of platform and seawater pipe line among pile legs.
• Hose structure:
Tube: nitrile rubber based liner, oil resistance, seawater resistance, high temperature resistance and ageing resistance.
Reinforcement: high tension steel cable.
Cover: Neoprene rubber based cover, fire-proof, wear resistance, oil resistance, ozone& ageing resistance, UV resistance, which is applicable to marine environment.
• Temperature range:-30℃ to +100℃.